The R.D. Harris Building opened on the existing Meridian High School campus in the fall of 2009. This three-story building is sited to work with the existing terrain with exits at the ground level of the second floor and the first floor. The students navigate a central staircase or use an elevator to access classrooms on all floors of this 67,700 square foot facility.

